As of September 7th, 2010, there will be a sigle lane closure for Eastbound Hillsboro Blvd. approaching Dixie Highway for roadway widening work.  The lane closure will be from the hours of 9am to 4pm.  Please use caution when driving through this area.

 As of September 7th, 2010, there will be a sigle lane traffic on North River Ave. for new drainage installation work.  The lane closure will be from the hours of 9am to 4pm and  Please use caution when driving through this area.

 
TRAFFIC UPDATE

Currently, there are no traffic issues to report on the project.

 
SEARCH


Dixie Flyover Rendering

This project involves the realignment of Dixie Highway from south of Hillsboro Boulevard (SR-810) to north of the Hillsboro Canal. Just north of the Hillsboro Boulevard intersection, the proposed 4-lane alignment raises vertically and becomes an elevated structure over NE 2nd Street, NE 1st Avenue, North River Avenue, Florida East Coast (FEC) Railway tracks, NE 2nd Avenue, and the Hillsboro Canal. Once the elevated structure crosses over the Hillsboro Canal and enters Palm Beach County, the alignment ties back down to the existing roadway. By eliminating an at-grade FEC Railway crossing, the new flyover will reduce travel times and decrease conflict points along the route, thereby providing local motorists and pedestrians with a safer route to downtown Deerfield Beach and the amenities of Pioneer Park.

* The rendering above is for general information only and does not show all details and is not to scale

Read more about

 
CONSTRUCTION PROGRESS

As of 8/15/2010:

% Contract Budget Expended = 27%

% Contract Time Used = 27%

 
CONSTRUCTION SCHEDULE

Antipated Schedule:

Completion of Pile Driving/Foundations - Fall/Winter 2010

Completion of Hillsboro FEC Rail Road crossing - Fall/Winter 2010

Completion of the 2nd Ave Ramp Bridge - Winter 2010/2011

Estimated Construction Complete Summer 2012.

Please see the Schedule Tab for more details.

 
CURRENT WORK

Anticipated work for the month of September 2010:

  • Continuation of Pile Driving for the Mainline Dixie and 2nd Ave. Ramp Bridges.
  • Continuation of Drainage pipe and Drainage structures.
  • Continuation of Earthwork north of the Hillsboro Canal.
  • Start of roadway widening on Hillsboro Blvd.
  • Continual maintenance of Storm Water Pollution Prevention Devices.
  • Continual maintenance of Traffic Control Devices.
 